Chicago O'Hare International Airport Estimated Runway Utilization at OMP Build Out Departures
0. 8/
22 R
27L
27C
22.1 /2.9
27L
R 14 27C
R 14
4L
0. 0/ 28R 28C
22 L
28C
8.9 /1.3
10C
0.0 /0.0
0.0 /23.8
28L
28L
0.9 /0.0
10R
10R
6.1 /1.2
Average Nighttime Departures Percentage (10p.m. to 7a.m.)
3.8 /0.0
Runways Decommissioned by Build-Out
Average Daytime Arrivals Percentage (7a.m. to 10p.m.)
Average Nighttime Arrivals Percentage (10p.m. to 7a.m.)
1. 0 0. 8/
10 .8
#.# /#.#
16 .2 /
Average Daytime Departures Percentage (7a.m. to 10p.m.)
23.5 /5.3
4R
4R
#.# /#.#
0.2 /0.1
L 32
L 32
2.7/0.0
22 L
10.3 / 20.4
10L
10C
0.0 /0.0
10L
27.7/ 50.0
28R
0. 0/
0. 0
0. 0
0. 0/
0. 0/
0.0 /59.8
R 32
0. 0
R 32
0. 0
0. 3
22 R
0.1 /0.0
10.4 /4.1
9R
4L
8.2 /0.6
0.0/0.0
9C
9R
25.3 / 12.2
9C
0.0 /0.0
22.4/4.0
0. 3/
1. 2
27R
L 14
27R
L 14
8.8/1.0
0.1/0.0
9L
9L
0.3 /0.1
Arrivals
Runways Decommissioned by Build-Out
Source: Federal Aviation Administration, O'Hare Modernization Final Environmental Impact Statement, Appendix F, Table F-39
Visit the Community Noise Resource Center on the internet at www.flychicago.com
O’Hare Airport Runway Arrivals/Departures/Use* The O’Hare Compatibility Commission (ONCC) works to find solutions to improve the quality of life for neighbors near O’Hare International Airport. In our continuing effort to keep O’Hare communities apprised of runway progress, we offer this O’Hare Airport Runway Fact Sheet highlighting arrivals, departures and use, as forecasted by the Federal Aviation Administration. All current and future runways accommodate all aircraft operating at O’Hare International Airport. Use this fact sheet with the accompanying Chicago Department of Aviation’s Future Runways and Noise illustration to see a “big picture” of how the O’Hare Modernization Program (OMP) is striving to achieve its goal to become the most efficient airport in the country. For example, reading left to right for Runway 9L: In a typical 24-hour day at OMP Full Build Out, the FAA forecast indicates 9L will experience 8.8% daytime arrivals; 1.0% night arrivals; 0.1% daytime departures; and 0.0% night departures. The forecast indicates 9L will be in service 4.4% of the day and 0.6% of the night. ONCC’s unique approach brings to the same table all the parties most able to reduce aircraft noise. Participants include the Chicago Department of Aviation, community leaders, the airlines, pilots, the FAA, air traffic controllers, and other aviation stakeholders.
O’HARE NOISE COMPATIBILITY COMMISSION To learn more about ONCC’s efforts to reduce aircraft noise in your community visit oharenoise.org or call 773-686-3198. To report aircraft noise, call 800-435-9569 or visit www.oharenoise.org Search: Noise Complaints
Existing North of Main Terminal ARRIVALS DEPARTURES Runway 9L-27R (Commissioned November 20, 2008) 9L 8.8% 1.0% 9L 0.1% 27R 22.4% 4.0% 27R 0.3%
0.0% 0.1%
9L 27R
4.4% 11.2%
0.6% 2.3%
Runway 4L-22R 4L 0.0% 22R 0.3%
1.2% 0.0%
4L 22R
0.4% 0.1%
0.5% 0.2%
0.0% 0.3%
4L 22R
0.8% 0.0%
IN USE
Existing South of Main Terminal ARRIVALS DEPARTURES Runway 10L-28R (Extended September 25, 2008) 10L 0.0% 23.8% 10L 10.3% 28R 0.2% 0.1% 28R 27.7%
20.4% 50.0%
10L 28R
5.2% 14.1%
22.4% 21.2%
Runway 4R-22L 4R 0.8% 22L 0.0%
0.0% 10.8%
4R 22L
0.4% 8.2%
0.6% 4.6%
1.0% 0.0%
4R 22L
0.0% 16.2%
IN USE
To Be Decommissioned 14L/32R and 14R/32L
Currently in use; no percentages available; to be decommissioned at OMP Full Build Out
To Be Constructed or Extended North of Main Terminal ARRIVALS DEPARTURES Runway 9C-27C (Scheduled Commissioning, 2020**) 9C 8.2% 0.6% 9C 0.0% 27C 22.1% 2.9% 27C 0.0% Runway 9R-27L (Scheduled Commissioning, 2020**) 9R 0.1% 0.0% 9R 27L 0.0% 59.8% 27L
10.4% 25.3%
IN USE 0.0% 0.0%
9C 27C
4.1% 11.0%
0.3% 1.7%
4.1% 12.2%
9R 27L
5.3% 12.8%
1.7% 39.7%
To Be Constructed South of Main Terminal ARRIVALS DEPARTURES Runway 10C-28C (Scheduled Commissioning, late 2013**) 10C 8.9% 1.3% 10C 0.0% 28C 23.5% 5.3% 28C 0.0%
0.0% 0.0%
10C 28C
4.4% 11.7%
0.7% 3.1%
Runway 10R-28L (Scheduled Commissioning, late 2015**) 10R 0.9% 0.0% 10R 28L 3.8% 0.0% 28L
1.2% 0.0%
10R 28L
3.5% 3.3%
0.5% 0.0%
6.1% 2.7%
IN USE
published in Appendix F, page F-82, Table F-39, of the Federal Aviation Administration’s forecast in its Final Environmental Impact Statement (FEIS) * Percentages July 2005 for the Chicago O’Hare International Airport Full Build Out. Totals may not add due to rounding. ALL PERCENTAGES REFLECT RUNWAY END USE. ** Based on current construction schedule. Future commissioning dates subject to change. Average daytime percentage, 7am to 10pm