EndoTherm energy saving additive for cooling systems.
113 Views
32 Downloads
FLIP PDF 1.36MB
Powered by
ENDOCOOL INTRODUCTION CONTACT:
Rob Black
07538 358166 [email protected]
The
Effect
System fluid
Radiator external wall
Radiator external wall
Applications • EndoCool is dosed into the secondary circuit of a wet cooling system • Dosed into a system at a ratio of 1 litre per 100 litres of system volume • No need to drain down the system fluid • Installation requires a certified HVAC installer • EndoCool will work synergistically with or without glycol antifreeze to deliver power saving as well as ensuring good climatic control of the airspace
Sample Installation Results
Case Study – Comfort Cooling EMCOR UK: Thirlmere House Warrington IPMVP Analysis – Pre & Post EndoCool 1000 900
System fluid
Electricity Consumption (kWh)
800 700 600
•
50 litres of EndoCool installed
500
•
Office building with small server room
400
•
FCU for comfort cooling
•
Radiatortest external wall 3 week study
200
•
Data recorded every 30 seconds
100
•
22.16% saving compared to baseline
•
Trialled using IPMVP Protocols
300
Radiator external wall
0 0
1
2
3
CDD
4
5
6
7
Case Study – Data Centre EMCOR UK: Lingley Mere Data Centre Warrington IPMVP Analysis – Pre & Post EndoCool 27000
•
50 litres of EndoCool installed
•
Large Data Centre (process cooling only)
•
7 week test study
23000
•
Data recorded every 30 seconds
22000
•
4.63% saving compared to baseline
21000
•
£700 saved
20000
•
8 month ROI
•
Radiator external wall
Electricity Consumption (kWh)
26000
System fluid
25000 24000
19000
Radiator external wall
Trialled using IPMVP Protocols
18000 0
5
10
15
20
25
30
Outside Temp (oC)
Note: process cooling or systems on 24/7 do NOT cycle & EndoTherm/EndoCool will not improve cycling or reduce run times. Therefore these systems should save in the region of 5%.
Case Study – Comfort Cooling Blue: Park Place (Dubai) • 54 storey skyscraper in Dubai’s Central Business District comprising offices, hotel & residential units • The primary load of the building is comfort cooling & requires constant air conditioning • EndoCool installed into 3 chilled water loops totalling 55,000 litres which make up cooling system IPMVP Analysis – Pre & Post EndoCool
800,000
y = 972.21x + 130153 R² = 0.9706
Electricity Consumption (kWh)
700,000 600,000 500,000
Baseline
400,000
Post-EndoCool Linear (Baseline)
300,000
Linear (Post-EndoCool) 200,000 100,000 0
100
200
300
400
CDD
500
600
700
Rob Black EndoTherm & EndoCool Business Development Partner M: +44 (0)7538 358166 E: [email protected] W: www.endoenterprises.com Endo Enterprises (UK) Ltd Unit 231 Europa Boulevard Gemini Business Park Warrington Cheshire WA5 7TN