4/28/2015

Brandon Dickens Brionne Beck, LEED GA Deepika Sangoi, LEED AP Felicia Fuller

LEED BD+C Exam Prep

Our Team Jeslin Varghese, LEED AP Jessica Kubena, LEED GA Kayla Gerstenberg, LEED AP Meredith Brown Nicole Keeler, LEED AP Rebecca Brown, LEED AP Zeinab Alameddine, LEED AP

Module 1 LEED Process (8 Qs)     

Evolutionary characteristics of LEED LEED Certification Process, MPR and Prerequisites Avenues to achieve LEED goals Project boundary, LEED boundary and property boundary Synergies

LEED Process (8 Qs)     

Evolutionary characteristics of LEED LEED Certification Process, MPR and Prerequisites Avenues to achieve LEED goals Project boundary, LEED boundary and property boundary Synergies

GBRIonline.org

1

4/28/2015

Online Modules LEED v4 Process: History of LEED LEED v4.0 Formation of GBCI 2007

LEED V1.0 LEED v2.1

2000

1993

2005

2009

2002

1998

2007 2013

LEED v2.0

LEED v2.2

Formation of USGBC

LEED 2009 or v3.0

LEED 2009 or v3.0 will be available for project registration until October 31st 2016 and certification until June 30th 2021

GBRIonline.org

2

4/28/2015

Online Modules LEED v4 Process: Overview

Location and Transportation Sustainable sites Innovation in design Water efficiency Regional priority Energy & atmosphere Materials & resources Indoor environmental quality

OnlineLEED Modules v4 Process: LEED Credit Weightings

40-49 points | 50-59 points | 60-79 points | 80+ points

GBRIonline.org

3

4/28/2015

Relative efficacy – Benefit Duration - Controllability of effect

35% 20% 15% 10% 10% 5% 5%

GBRIonline.org

4

4/28/2015

Theresa Lehman, LEED Fellow

Miron Construction

GBRIonline.org

5

4/28/2015

GBRIonline.org

6

4/28/2015

GBRIonline.org

7

4/28/2015

GBRIonline.org

8

4/28/2015

21

GBRIonline.org

9

4/28/2015

GBRIonline.org

10

4/28/2015

Intuitive

Transparent Simple

Flexible

Industry-specific

Section Quiz

Review

Evolutionary Characteristics of LEED

GBRIonline.org

11

4/28/2015

?

Question: Which of the following represent LEED’s system goals or the impact categories?

Answer

?

Question: What are the 3 association factors USGBC used to measure and scale LEED credit outcome?

Answer

1. Relative efficacy 2. Benefit Duration 3. Controllability of effect 4. Energy Efficiency 5. Health and Human Comfort

?

Question: How does LEED address Global Adaptability. Select (3)?

Answer

GBRIonline.org

1. Climate Change 2. Human Health and Well-Being 3. Water Resources 4. Biodiversity 5. Material Resources 6. Greener Economy 7. Community 8. All of the above

1. Integrated universal language 2. ACPs 3. LEED International Roundtable 4. More Reference Standards 5. Enhanced Performance

12

4/28/2015

1.

Question: Which of the following are drivers behind 21 adaptations under LEED? Choose (3)?

Answer

?

To spur market transformation 2. To make LEED easier for new market types 3. To consider the unique needs and challenges of specific space types 4. Regulatory requirements 5. International Round Table

?

Question: What are some examples of improved LEED Documentation? Select 3

Answer

1. Simple 2. Flexible 3. Industry-specific 4. Interactive 5. Global Adaptability

LEED Process (8 Qs)     

Evolutionary characteristics of LEED LEED Certification Process, MPR and Prerequisites Avenues to achieve LEED goals Project boundary, LEED boundary and property boundary Synergies

GBRIonline.org

13

4/28/2015

Online Modules LEED v4 Process: GBRI’s LEED BD+C Project

PROJECT TITLE: GBRI New Office Building RATING SYSTEM: LEED v4 LEED BD+C LOCATION: San Antonio, Texas, USA AREA OF EXISTING FACILITY: 20,000 SF

Project 1- BD+C, San Antonio, TX

?

Question: What’s the Next Step? Answer

GBRIonline.org

14

4/28/2015

Online Modules LEED v4 Process: Certification Process LEED Certification Process

Registration Application

Preliminary review Prelim review response Final review

Accept or appeal

Appeal review Certification/ denial

Online Modules LEED v4 Process: Review Process Standard Review

Split Review

• Previously known as “combined review” • Design/Construction credits submitted all at once

• Design Credits • Construction Credits

Online LEED Modules v4 Process: Phases of Certification

Submit application for design review LEED Work Plan & Project Set Up

Submit application for construction review Submit response to preliminary design review

GBCI issues preliminary design review Registration

GBRIonline.org

Submit response to preliminary construction review

GBCI issues preliminary construction review GBCI issues final design review decisions

Credit interpretation ruling

GBCI issues final construction review decisions

Certification awarded

Credit appeal

15

4/28/2015

Online Modules LEED v4 Process: Prerequisites Pre-requisites 

The term ‘prerequisite’ refers to a mandatory project characteristic. Measurement, quality, value or function as identified within the LEED rating system.



Prerequisites represent that key criteria that define green building performance.



Failure to meet any prerequisite will render a project ineligible for certification.

Examples

SUSTAINABLE SITE PREREQUISITE 1 – CREATE A CONSTRUCTION ACTIVITY POLLUTION PREVENTION PLAN

WATER EFFICIENCY PREREQUISITE 1 – REDUCE OVERALL WATER CONSUMPTION BY 20% (COMPARED TO BASELINE)

ENERGY & ATMOSPHERE PREREQUISITE 3- ZERO USE OF CFC-BASED REFRIGERANTS

MATERIALS AND RESOURCES PREREQUISITE- COLLECT AND STORE RECYCLABLES

INDOOR ENVIRONMENTAL QUALITY 1- PROHIBIT SMOKING

Online Modules

Regional Priority

Innovation

Indoor Environmental Quality

Materials & Resources

Energy & Atmosphere

Water Efficiency

Sustainable Sites

Location & Transportation

Integrative Design Credit

Online Modules LEED v4 Process: Credit Categories

LEED v4 Process: Credits

Credits 

The phrase ‘credit’ means a non-mandatory project characteristic, measurement, quality, value or function as identified within a LEED rating system. Credits represent particular facets of sustainable design that contributes to overall green building performance.



No single credit is mandatory, credits are selected and pursued at the options of a LEED project team.



Each credit for the rating system include information on: INTENTS STRATEGIES REQUIREME NTS ENVIRONMENTAL & ECONOMIC ISSUES RELATED CREDITS

REFERENCE STANDARDS IMPLEMENTATION IDEAS & STRATEGIES TIMELINE AND TEAM INFORMATION CALCULATION DOCUMENTATION

EXEMPLARY PERFORMANCE

Local, state, and federal rules ALWAYS take precedent over LEED requirements and referenced LEED standards. If a LEED Credit says ‘do X,’ first review any relevant laws, codes, local ordinances, and statutes to make sure there isn’t a conflict.

GBRIonline.org

16

4/28/2015

1. Give clear guidance to customers 2. Protect the integrity of the LEED program 3. Reduce challenges that occur during the LEED certification process

Minimum Program Requirements

Online Modules LEED v4 Process: Minimum Program Requirements Minimum Program Requirements 1. Must be in a permanent location on existing land 2. Must use reasonable LEED boundaries 3. Must comply with project size requirements

Online Modules LEED v4 Process: Minimum Program Requirements Minimum Program Requirements 1. Must be in a permanent location on existing land Criteria

Intent Since LEED credits are dependent on the project’s location, it is critical to evaluate projects as permanent structures.

GBRIonline.org



All projects must be constructed and operated in a permanent location on existing land. •

No project that is designed to move at any point in its lifetime may pursue LEED certification.



Applies to all land within the LEED project.

17

4/28/2015

Online Modules LEED v4 Process: Minimum Program Requirements Minimum Program Requirements 2. Must use reasonable LEED boundaries Criteria

Intent Defining a reasonable LEED boundary ensures that project is accurately evaluated.





The LEED boundary must include all contiguous land that is associated with the project and supports its operations. The boundary may not unreasonably exclude portions of the building, space, or site to give the project an advantage.



Project team must clearly communicate the project boundary and distinguish it from noncertifying spaces.

Online Modules LEED v4 Process: Minimum Program Requirements 3. Must comply with project size requirements Intent LEED requirements do not accurately assess the performance of projects outside of these size requirements.

Criteria LEED BD+C: minimum1,000 square feet of gross floor area LEED O+M: minimum1,000 square feet of gross floor area LEED ID+C: minimum 250 square feet of gross floor area LEED for Homes: defined as a “dwelling unit” by all applicable codes LEED for ND: at least 2 habitable buildings , no larger than 1500 acres

Credit Interpretation Requests/Rulings (CIR)

GBRIonline.org

18

4/28/2015

Online LEED v4Modules Process: Credit Interpretation Request

Credit Interpretation Requests $220 = cost of submitting a CIR

USGBC company members, LEED registered project team members, and workshop attendees have access to view CIRs. CIR ruling do not affect the existing requirements of credits within the rating system.

Rulings = 2-5 weeks

600 words = limit of CIR

 No credit or points are awarded by the CIR process  The project team must still demonstrate credit compliance in order to achieve the credit

Online Modules LEED v4 Process: LEED Interpretation

LEED Interpretations are official answers to technical inquiries about implementing LEED on a project.

Precedent setting

Subject to consensus based review

GBRIonline.org

Published online

19

4/28/2015

“LEED Interpretations are similar to Project CIRs but they are precedent setting as the results can be applied to all future LEED projects” USGBC

 Difference between a LEED Interpretation and a Project Credit Interpretation Ruling (CIR) ?

Question: Where do you register your project?

? Answer

Online Modules LEED v4 Process: LEED Online Access https://www.usgbc.org/leedonline.new/ Usage All v4 projects and v2009 campus projects. Individual v2009 projects should still use former platform (LEED Online v3).

Functionality

GBRIonline.org

20

4/28/2015

Online LEEDModules v4 Process: LEED Project Administrator • Invite team members to LEED Online

• Assign team members to credits in LEED Online

• Submit the project application to GBCI for review

Online Modules LEED v4 Process: Credits, Prerequisites, MPRs & CIRs Project must satisfy three requirements for certification:

Incase of any clarification about any credit:

Minimum project requirement (MPR)

Credit Interpretation Ruling (CIR)

Pre-requisites Minimum credit for desired certification level

For full details and up-to-date information on the MPRs of the rating systems visit: http://www.usgbc.org/DisplayPage.aspx?CMSPageID=2102

Online LEED Modules v4 Process: Phases of Certification

Submit application for design review LEED Work Plan & Project Set Up

Submit application for construction review Submit response to preliminary design review

GBCI issues preliminary design review Registration

GBRIonline.org

Submit response to preliminary construction review

GBCI issues preliminary construction review GBCI issues final design review decisions

Credit interpretation ruling

GBCI issues final construction review decisions

Certification awarded

Credit appeal

21

4/28/2015

Online Modules LEED v4 Process: LEED Work Plan

INITIATE DISCOVERY PHASE

CONTINUE DISCOVERY PHASE

SELECT LEED RATING SYSTEM

CONTINUE ITERATIVE PROCESS

CHECK MINIMUM PROGRAM REQUIREMENTS

ASSIGN ROLES AND RESPONSIBILITIES

ESTABLISH PROJECT GOALS

DEVELOP CONSISTENT DOCUMENTATION

DEFINE LEED PROJECT SCOPE

PERFORM QUALITY ASSURANCE REVIEW AND SUBMIT FOR CERTIFICATION

DEVELOP LEED SCORECARD

1. INITIATE DISCOVERY PHASE

LEED Process – Devising a LEED Work Plan

2. SELECT LEED RATING SYSTEM

GBRIonline.org

22

4/28/2015

Clarify terminology… 21 checklists? 21 what?

Q: Which Rating system Fits ours the most?

? Answer:

PERCENTAGE OF FLOOR AREA APPROPRIATE FOR A PARTICULAR RATING SYSTEM 40% SHOULD NOT USE THAT RATING SYSTEM

GBRIonline.org

40%-60% PROJECT’S TEAM CHOICE

60% SHOULD USE THAT RATING SYSTEM

23

4/28/2015

BD+C PROJECT TITLE: GBRI New Office Building LOCATION: San Antonio, Texas, USA AREA OF EXISTING FACILITY: 20,000 SF

OUR PROJECT

Online Modules LEED v4 Process: LEED Online LEED V3 or 2009 Online link

LEED v4 online portal link

LEED 2009 or v3.0 will be available for project registration until October 31st 2016 and certification until June 30th 2021

Project Registration Fees - http://www.usgbc.org/cert-guide/fees

GBRIonline.org

24

4/28/2015

STEP 3- Check Minimum Program Requirements What is it? When is it performed? Who is responsible for this? Our project…

STEP 4- Establish Project Goals What is it? When is it performed? Who is responsible for this? Our project…

STEP 5- Define LEED Project Scope What is it? When is it performed? Who is responsible for this? Our project…

GBRIonline.org

25

4/28/2015

STEP 6- Develop LEED Scorecard What is it? When is it performed? Who is responsible for this? Our project…

LEED Online V4.0 Score Card

GBRIonline.org

26

4/28/2015

Adding Team Members – LEED v4

STEP 7 & 8- Discovery Phase What is it? When is it performed? Who is responsible for this? Our project…

Online Modules LEED v4 Process: Project Team Member Roles OWNER  Secure financing  Develop overall project goals

Project Administrator  Registers projects  Invites/assigns team members  Chooses rating system

GBRIonline.org

27

4/28/2015

Online Modules LEED v4 Process: Project Team Member Roles Commissioning Authority Commissioning authority  Reports to the owner  Reviews the OPR and BOD  Commissions & verifies building systems

Architect architect

 Designs the building

Online Modules LEED v4 Process: Project Team Member Roles General Contractor General contractor  Responsible for construction

Facilities Manager Facility manager  Responsible for building after construction

STEP 10 & 11 – Develop Consistent

Documentation & Perform Quality Assurance What is it? When is it performed? Who is responsible for this? Our project…

GBRIonline.org

28

4/28/2015

Online LEED Modules v4 Process: Phases of Certification

Submit application for design review LEED Work Plan & Project Set Up

Submit application for construction review

GBCI issues preliminary design review Registration

Submit response to preliminary construction review

Submit response to preliminary design review

GBCI issues preliminary construction review GBCI issues final design review decisions

Credit interpretation ruling

GBCI issues final construction review decisions

Certification awarded

Credit appeal

Online Modules LEED v4 Process: Documentation

FTE DENSITY BUILDABLE LAND FLOOR-AREA RATIO (FAR)

FTE

Full Time Equivalents

GBRIonline.org

29

4/28/2015

Online Modules LEED v4 Process: Documentation

REGULAR BUILDING OCCUPANTS

VISITORS

Online Modules LEED v4 Process: Documentation Occupancy FTE Related credits A SINGLE ONE TIME ENTRY OF THE FTE IS REQUIRED & WILL APPLY TO THE FOLLOWING CREDITS: LT Credit Bicycle Facilities LT Credit access to quality transit SS Credit Direct Exterior Access WE Prerequisite and Credit Indoor Water Use

Equation 1 FTE employees = Full-time employees + (Σ daily part-time employee hours / 8)

Online Modules LEED v4 Process: Documentation Occupancy FTE

Related credits A SINGLE ONE TIME ENTRY OF THE FTE IS REQUIRED & WILL APPLY TO THE FOLLOWING CREDITS: LT Credit Bicycle Facilities LT Credit access to quality transit SS Credit Direct Exterior Access WE Prerequisite and Credit Indoor Water Use

a. Default occupant density from ASHRAE 62.1-2010, Table 6-1 b. Default occupant density from CEN Standard EN 15251, Table B.2 c. Appendix 2 Default Occupancy Counts

For buildings with more unusual occupancy patterns, calculate the FTE building occupants based on a standard eight-hour occupancy period.

Equation 2 FTE employees = (Σ all employee hours / 8)

d. Results from applicable studies.

GBRIonline.org

30

4/28/2015

Review

A project in Raleigh, North Carolina was originally registered under BD+C: New Construction. Later during the pre-design stage, the owner finds 3 tenants to occupy the building space upon completion and hence wants to change the rating system to Core and Shell. Which action should be taken by the project team to determine whether switching the rating system is possible

A.

Answer

?

Project should Submit a project CIR B. The Project should submit a LEED Interpretations C. The project should submit the issue via the feedback button within leedonline.com D. The project should contact the LEED technical customer service

A.

A project is pursuing combined review for LEED documentation. Which of the following should the team take care of prior to submitting for USGBC review inorder to avoid any delays with respect to USGBC review and project certification?

Answer

GBRIonline.org

Request more time from USGBC for project review B. Request more time from USGBC for Quality assurance review C. Wait until the construction is complete before collecting documentation from contractors and vendors D. Verify that numeric values (FTE, site area, etc.) are consistent across credits E. Project Manager or a team member should check for completeness of each online form F. Do an internal quality assurance review of the submissions

31

4/28/2015

A.

Which of the following is true of a LEED Project Administrator? Choose 3

Answer

?

Invite team members to LEED Online B. Request more time from USGBC for Quality assurance review C. Assign team members to credits in LEED Online D. A team member joining LEED online enjoys equal rights as the LEED Project Administrator E. Submit CIR

LEED Process (8 Qs)     

Evolutionary characteristics of LEED LEED Certification Process, MPR and Prerequisites Avenues to achieve LEED goals Project boundary, LEED boundary and property boundary Synergies

Avenues to achieve LEED Goals 1. Innovation Credits Innovation Pilot Credits Exemplary Performance 2. Regional Priority Credits

GBRIonline.org

32

4/28/2015

LEED v4 Process: Innovation in Design

Online Modules LEED v4 Process: Innovation Credit Credit Category

Project Type / Rating System

Innovation in Design

NC

CS

Schools

Hosp

Retail

Data

Ware

Health

Maximum Possible Points

6

6

6

6

6

6

6

6

Option 1

Innovation

1

1

1

1

1

1

1

1

Option 2

Pilot Credit

1

1

1

1

1

1

1

1

Option 3

Additional Strategies (Innovation, Pilot or Exemplary Performance)

3

3

3

3

3

3

3

3

Credit 2

LEED Accredited Professional

1

1

1

1

1

1

1

1

Online Modules LEED v4 Process: Innovation Credit

For buildings with more unusual occupancy patterns, calculate the FTE building occupants based on a standard eight-hour occupancy period.

GBRIonline.org

33

4/28/2015

Online Modules LEED v4 Process: Innovation Credit

Online Modules LEED v4 Process: Innovation Credit

GBRIonline.org

34

4/28/2015

Online Modules LEED v4 Process: Innovation Credit

Innovation (1-3 points) ·Defined in Option 1 above Pilot (1–3 points) Meet the requirements of Option 2 Exemplary Performance (1–2 points) Explained on next slide

MAX of 5 Points  Innovation (up to 4 points)  Pilot credits (up to 4 points)  Exemplary performance (up to 2 points)

Innovation point strategy

GBRIonline.org

35

4/28/2015

Q: Who is responsible for this credit

? Answer:

Q: How to implement this IN credit?

? Answer:

GBRIonline.org

36

4/28/2015

Identify innovative strategies IMPLEMENTATION – ALL OPTIONS

http://www.usgbc.org/pilotcredits

IMPLEMENTATION

Step 1.Identify target Step 2. Confirm exemplary implementation performance credits IMPLEMENTATION

GBRIonline.org

37

4/28/2015

Confirm Credit Eligibility

Document Credit

IMPLEMENTATION

Rating System Variations  Core and Shell Projects  Campus Projects  Group Approach  Campus Approach

IMPLEMENTATION

 Technology or strategy that aids an existing LEED credit  Closed pilot credits  No strategy can achieve more than 1 point  Corporate strategies are not considered innovative Ineligible Strategies

GBRIonline.org

38

4/28/2015

DOCUMENTATION

Online Modules LEED v4 Process: Innovation Credit

GBRIonline.org

39

4/28/2015

 Identify a project team member who is a LEED AP with specialty OR  Engage a LEED AP with specialty to support the project  Active credential required  LEED APs without specialty (legacy LEED APs) do not qualify IMPLEMENTATION

DOCUMENTATION

Avenues to achieve LEED Goals 1. Innovation Credits Innovation Pilot Credits Exemplary Performance 2. Regional Priority Credits

GBRIonline.org

40

4/28/2015

LEED v4 Process: Regional Priority

LEED v4 Process: Regional Priority Credit Category

Project Type / Rating System

Regional Priority

NC

CS

Schools Hosp

Maximum Possible Points

4

4

4

Retail

Data

Ware

Health

4

4

4

4

4

Credit 1

Regional Priority: Specific Credit

1

1

1

1

1

1

1

1

Credit 2

Regional Priority: Specific Credit

1

1

1

1

1

1

1

1

Credit 3

Regional Priority: Specific Credit

1

1

1

1

1

1

1

1

Credit 4

Regional Priority: Specific Credit

1

1

1

1

1

1

1

1

GBRIonline.org

41

4/28/2015

IMPLEMENTATION

DOCUMENTATION

Review GBRIonline.org

42

4/28/2015

A.

A project team after careful research identified 2 innovative ideas for successful innovation credits that were implemented in past LEED projects and awarded innovative credits for. Which of the following actions should the project team take for successful implementation of the innovative ideas?

C.

D.

Review the LEED Reference Guide

E.

Wait till the project is complete to document the innovation credit and submit the documentation via LEED online

Answer

A.

In May,2014 USGBC published an addenda for a credit under BD+CNew Construction. Which of the following statements are true for a new Construction project that was registered in December of 2013.

Answer

Answer

?

The project team must follow any addenda published prior to December, 2013 B. Submit a CIR for clarification C. The project team must follow any addenda published in May, 2014 D. The project team can choose to follow any addenda published after May, 2014 E. The project team can choose to follow any addenda published prior to December, 2013

A.

Which of the following may earn a project IN Credit Innovation under option 1Innovation? Select 2

GBRIonline.org

Contact the LEED project to learn more on implementing them B. Seek formal pre-approval from USGBC by submitting a CIR Implement the innovative ideas and document them just like other credits

?

Achieving LEED certification under two different rating systems B. Designing and implementing a green education program C. Corporate Carpool program D. Designing and implementing a green housekeeping program E. A Closed pilot credit

43

4/28/2015

LEED Process (8 Qs)     

Evolutionary characteristics of LEED LEED Certification Process, MPR and Prerequisites Avenues to achieve LEED goals Project boundary, LEED boundary and property boundary Synergies

Project Boundary Development footprint of the building. *must stay consistent

Property Boundary Project’s legal property line.

GBRIonline.org

44

4/28/2015

LEED Boundary Site area affected by construction. *includes building footprint + any land impacted by construction

LEED Boundary Additional Guidance • • • •

Site Building Interiors Neighborhoods

Review GBRIonline.org

45

4/28/2015

How is the LEED boundary defined for a single building ?(choose 2)

?

A.

The entire project scope - generally limited to the site boundary B. The portion of project site submitted for LEED certification C. The edge of the building footprint D. The edge of the development footprint

Answer

?

A.

A campus project in Seattle with 100 acres has 7 buildings. How is the LEED boundary determined if each building will be a separate LEED project?

The LEED boundary is at the edge of each building's footprint

B.

C.

Answer

A project is the middle of a goalsetting charrette. Which of the following special considerations would be part of the LEED project scope?(Choose 2)

Answer

GBRIonline.org

Each building has the boundary at the edge of at least 12 acres The project team determines the LEED boundary for each LEED project D.

The LEED boundary is at the perimeter of the 100-acre area

? A.

A shared facility that may be used by the project occupants B. Underground parking C. An off-site amenity D. Energy Modeling E. Commissioning

46

4/28/2015

LEED Process (8 Qs)     

Evolutionary characteristics of LEED LEED Certification Process, MPR and Prerequisites Avenues to achieve LEED goals Project boundary, LEED boundary and property boundary Synergies

SYNERGY synergy (syn·er·gy) the interaction of two or more agents or forces so that their combined effect is greater than the sum of their individual effects. cooperative interaction among groups, especially among the acquired subsidiaries or merged parts of a corporation, that creates an enhanced combined effect.

GBRIonline.org

47

4/28/2015

Review GBRIonline.org

48

4/28/2015

THANK YOU Questions? Email [email protected]