Data Loading...
OakandMain PMReport 15JAN21 Flipbook PDF
OakandMain PMReport 15JAN21
121 Views
56 Downloads
FLIP PDF 511.3KB
Source Preventative Maintenance Report
Oak and Main SurgiCenter 907 N. Main Street, Bldg C Vineland, NJ 08360
PERFORMED BY SERVICE DATE TECHNICIAN PROCESSED BY
Major Medical Hospital Services, Inc. January 15, 2021 Ontay Anderson Robyn Rumbos
Scope of Work Performed Major Medical Hospital Services, Inc. has evaluated the medical source equipment system on the date indicated in this report and it meets the manufacturers and hospital guidelines in accordance NFPA, JACHO, Maintenance report. The preventive maintenance & testing has been performed in accordance with the most recent guidelines available and all recommendations may not require immediate compliance. The hospital is urged to repair or replace any items that are labeled for repair if not done at the time of service, as soon as possible. Information recorded during this preventative maintenance and included in this report represents our findings on the indicated evaluation date(s) only. Source equipment monitoring will be performed periodically by the trained professionals of MMHSI and results will be presented in an electronic report. This report will be prepared following the survey and will include a summary of the results, along with recommendations for actions needed to comply with the standards noted. Corrective Actions Changed oil and oil filters
Recommendations No recommendations were needed at this time.
Future Considerations
No future considerations were needed at this time.
2
Medical Vacuum Maintenance Record Facility: Address: Floor: System Mfg: System S/N: Date of Service:
Oak and Main SurgiCenter 907 North Main Street, Vineland, NJ 08860 (Building C) Ground Location: Pump Room-Mechanical Room Ohio Medical Model: S500LB-T2V 200394 Service Area: Entire Facility Friday, January 15, 2021 Visit Type: Preventative Maintenance
Ambient Temperature Minimum Run Time Disconnect Rating Pipe Inlet Size Comments: Inspected = OK Wire Condition OK Strainers NA Auto Drains NA Safety Valves OK Grease Motors OK Set Points Cut In Cut Out
Lead 19 24
71°F 2 Min 28.0A 1 1/4"
System Size System Voltage Primary Fuse Pipe Outlet Size
Cleaned = CL Indicator Lights Gauges Check Valves Intake Elements Alternation PS2 N/A N/A
PS3 N/A N/A
Manufacturer Model Number Serial Number Hours Condition Drive Bearing Carrier Bearing
Pump 1 Busch RA0100F U181600230 6870 OK 141°F 136°F
Pump Time
Minutes Seconds 2 10
Horse Power Drive Bearing Carrier Bearing Voltage A/B Voltage B/C Voltage A/C Amperage T1 Amperage T2 Amperage T3
Drive Motor 1 5 85 78 242 N/A N/A 15.2A 15.7A N/A
Duplex 230 CB.6 1 1/4"
Not Applicable = NA OK Drive Belts OK Couplings OK Control Valves OK Drip Leg OK Bearings
Pump Type System Amperage Secondary Fuse Misc.
Lube Vane Pump 43.66 CB1.6 -
Follow-up = FN Replaced = RP NA Safety Guards OK OK Water Control Valve OK NA Water Temp. In NA NA Water Temp. Out NA OK Local Alarms Tested NA
Lag 18 23
Lag in Use Lag is not currently in use Pump 2 Busch RA0100F U173900270 6854 OK 153°F 149°F
Minutes 2
Seconds 07
Drive Motor 2 5 98 83 242 N/A N/A 16.6A 16.8A N/A
Pump 3 N/A N/A N/A N/A N/A N/A N/A Minutes N/A
Seconds N/A
Drive Motor 3 N/A N/A N/A N/A N/A N/A N/A N/A N/A
Pump 4 N/A N/A N/A N/A N/A N/A N/A Minutes N/A
Drive Motor 4 N/A N/A N/A N/A N/A N/A N/A N/A N/A
Technician Comments Pumps are running a little hot. Recommend cooling the room down or placing a fan at the pumps. Changed oil and oil filters. Exhaust filters, check valves are yearly maintenance to be changed next PM.
3
Seconds N/A