PHASE I & II Environmental Site Assessments The Consumer’s Perspective

Objectives of Training • Familiarize you with AAI requirements

• Provide overview of how AAI impacts Brownfields grant process • Provide overview of technical requirements of what constitutes an AAI-compliant Phase I ESA and what is good practice within the industry • Overview of Phase II

AAI in Perspective • All Appropriate Inquiries often is a critical step in a continuum of property investigations. – AAI / Phase I – Phase II Sampling and Analysis – Additional Site Characterization

– Cleanup and reuse planning

• Investigate potential environmental conditions or challenges and address the contamination to protect public health/environment and pursue redevelopment.

How Does AAI Affect You? • Threshold Criteria for Brownfields Grant Applicants – To apply for Cleanup grant or Site-Specific Assessment grants an eligible entity must demonstrate protection from CERCLA liability

• Recipients of Brownfields Assessment Grants

– Must conduct Phase I assessments in compliance with AAI

• Help others understand and manage AAI

– Parties seeking protection from CERCLA liability must conduct AAI prior to purchasing property

AAI – the "Other" Perspective • 2002 Brownfields Amendments to CERCLA

– Amended CERCLA and provided liability protections for certain property owners • Clarified Innocent Landowner Defense • Added Contiguous Property Owner • Added Bona Fide Prospective Purchaser

– Required EPA to develop regulations establishing standards and practices for conducting AAI – Established EPA’s Brownfields Grant Program

Brownfields Grants – Applicants, Generally • Brownfields grant applicants are prohibited from using grant money to pay for a response cost for which the recipient of the grant is potentially liable under CERCLA section 107. • Therefore, grant applicants must demonstrate they are not liable for contamination to be addressed by grant.

– Acquired property involuntarily (CERCLA 101(20)(D)) – Acquired property by eminent domain (CERCLA 101(35)(A)(ii)) – Are a bona fide prospective purchaser (BFPP) – Meet requirements for BFPP, but purchased property prior to January 11, 2002

But there is more… AAI = BFPP + Continuing Obligations Bona Fide Prospective Purchaser

• AAI prior to purchase

– 1-Year w/ 6-mo. Update – ASTM E1527-05

• Acquire after disposal of hazardous substances occurred • Not potentially liable or affiliated with liable party

Continuing Obligations

• Comply with land use restrictions • Do not impede institutional controls • Take reasonable steps to stop and prevent releases • Provide legal notices on discovery • Provide access and information upon request

Stepping up to Continuing Obligations (to maintain liability protections)

• Activity and Use Limitations (AULs) – Broad term encompassing institutional and engineering controls – Stay with the property – FOREVER – Noncompliance can jeopardize liability protections – Work with the state to change or eliminate – Create a monitoring plan to document long term compliance

Stepping up to Continuing Obligations (to maintain liability protections)

• Seek closure to recognized environmental conditions identified in the AAI/Phase I report • Address identified releases to limit human and environmental exposure to contamination • Prevent any future releases (by owner or operators) • Notify the State on new and /or previously unidentified releases to the environment • If disaster strikes, call in the state and/or EPA for assistance

Reminder on AAI for local governments • Involuntary taking of property, through tax foreclosure or eminent domain, provides inherent liability protections – Remember – Continuing Obligations apply

• Taking a property through donation or any dollar amount requires AAI to establish BFPP status (and all that goes with it)

When Must AAI be Performed? • Any party seeking liability protection must perform AAI before acquiring the property (before date of title transfer). • AAI must be conducted or updated within one year prior to date of acquisition. • Interviews, records review, site inspection, and the environmental cleanup lien search must be conducted or updated within 180 days prior to the date of acquisition.

Recommends ASTM 1527-05 Report Format • • • • • • • •

Summary Introduction Site Description User Provided Information Records Review Site Reconnaissance Interviews Findings

– – –

Known & suspect RECs Historic RECs De minimis conditions

• Opinion – – –

RECs (yes or no) Significant data gaps Additional appropriate investigations

• Conclusions

• • • • • •



RECs & ASTM declarations

Deviations Additional Services References Signature of EP Qualifications of EP Appendices

Phase I Report – Checklist • Required To-Do for Grant Project Managers Require Review of: – EP Opinion of environmental conditions – Identify data gaps – Qualifications and signature of EP – EP Opinion regarding additional investigation

• Available on EPA AAI website and from your grants project officer

Phase I ESA vs. Phase II SI Phase I ESA ASTM E1527-05

Phase II SI ASTM E1903-11

Standard research study intended to gather sufficient information to assess the environmental condition of the property and identify actual or potential areas where hazards substances may have been released to the environment.

Intrusive study where actual physical environmental samples are collected and analyzed to characterize the type, distribution and extent of hazardous substances in the environment.

Phase I ESA • Purpose (ASTM E1527-05) “Identify the presence or likely presence of any hazardous substances or petroleum products on a property under conditions that indicate an existing release, a past release, or a material threat of a release of any hazardous substances or petroleum products into structures on the property or into the ground, ground water or surface water of the property.” Blah…Blah…Blah…

What is a Phase I ESA? • Research Historical Documents/Information – – – –

Land-use activities Business activities Land development timeline Areas where hazardous substances may have been used, handled, stored, generated, and/or released – Regulatory history – Environmental liens

Purpose of a Phase I ESA • Assess the potential for hazards substances to have impacted the property (REC) • Liability protection under CERCLA • Support go/no go decisions to acquire real property • Brownfields grant programs require Phase Is to be completed • Identify continuing obligations

Liability Protections • Innocent Landowners

(CERCLA Sections 101(35)(A) • Contiguous Property Owner

(CERCLA Sections 107(q) • Bona Fide Prospective Purchaser (CERCLA Sections 101(40) and 107(r)

Phase I Requirements • All Appropriate Inquiry (AAI) - Any party seeking liability protection must perform AAI before acquiring the property (i.e., before date of title transfer) – 40 CFR Part 312

• ASTM E1527-05 Standard Practice for Environmental Site Assessments: Phase I Environmental Site Assessment Process • ASTM E2247-08 Standard Practice for Environmental Site Assessments: Phase I Environmental Site Assessment Process for Forestland or Rural Property

Who can prepare a Phase I ESA? • Qualified Environmental Professionals include: – Professional Engineers and Geologists with 3-years experience – Environmental practitioners having a baccalaureate or higher degree in engineering or science with 5 years experience – Environmental practitioners with 10-yrs of full time experience in the environmental field

What is included in a Phase I ESA? • • • • •

• • • •

Property Description Building/Structure Descriptions Historical and Current Land Use Interviews Historic Aerial Photo and Map Summaries Governmental Database Reviews Historic Document Summaries Site Reconnaissance Findings (identification of RECs)

What is NOT typically included? • Hazardous Building Materials Survey – Asbestos – Lead-Based paint – PCB/Mercury light ballasts/switches

• • • •

Wetland Surveys Radon Gas Surveys Floodplain Assessments Geo-Hazard Assessments

Results of a Phase I ESA • Recognized Environmental Condition (REC) • Historic Recognized Environmental

Condition • De Minimis Condition

What else do I need to know… • More than the minimum can be requested – Recommendations for further actions – Hazardous Substance Surveys – Geohazard Surveys

• Allow 4 to 8 weeks for completion – Typical Schedule Drivers • Site Access • Interviews • Regulatory Agency Data Requests

Phase I Cost Drivers • Don’t judge a book by its cover – Industrial Area – Small Property – Vacant Property

• Lowest cost is not always the best!!! – Cost should be a reflection of the level of liability protection

How Can I Manage My Costs • Complete site eligibility forms completed and approved before hiring a consultant • Facilitate site access for your Phase I provider • Select properties/parcels within a focused area • Select properties with known willing sellers • Facilitate interviews

Ponding Area

Engine Shop Rail Spurs

AST Landfill Area

Phase II Site Investigations • Standard ASTM E1903-11: Phase II Environmental Site Assessment Process • Purpose – Determine whether a release has occurred – Delineate the extent of contamination – Develop remediation cost estimate – Baseline environmental condition for liability purposes – Obtain regulatory closure

Typical Phase II Deliverables • Work Plan

– Sample and Analysis Plan • • • • • • • •

Purpose Site Background Areas of Concern Chemicals of Concern/Target Chemicals Conceptual Site Model Sample Location/Media Rationale Sample Techniques Analytical Methods

– Quality Assurance Plan – Health and Safety Plan

Typical Phase II Deliverables Cont’d • Phase II Report – Purpose or goals and objectives – Summary of field activities – Summary of analytical results – Health Risk Assessment • Published Standards • Site-Specific HHRA

– Data Validation – Results & Recommendations

Typical Phase II Process • Work Planning – Establish goals and objectives – Define Site Investigation Boundaries – Develop Conceptual Site Model – Determine regulatory oversight needs

Typical Phase II Process Cont’d • Pre-Field Work Activities – Permitting • Drilling/Well Permits • Street Closure/Encroachment Permits • Site Access

– Subsurface Utility Clearance • Underground Service Alert (USA) • Geophysical Survey

Typical Phase II Process Cont’d • Field Work – Access limitations – Soil Vapor Surveys – Groundwater Sampling – Mobile Laboratory • Reporting – Summary of Field Activities – Summary of Analytical Results – Health Risk Assessment – Recommendations & Conclusions

Phase II Cost Drivers • Regulatory Involvement • Access Limitations – – – –

Physical Work Time Media of Concern Analytical Methods

• Investigation Derived Wastes • Site Specific Human Health Risk Assessment

How Can I Best Manage My Costs • Provide All Site Background Information • Facilitate Site Access with Property Owner/Operator • Focused Site Delineation • Well Defined Scope of Work and Project Objectives • Coordinate Scoping Meeting • Ask to see a detailed breakdown of project costs • Conduct Phase II on Sites that are not Expected to Require Remediation

Case Study North Santa Fe & Orange Property - Vista • Challenges – Property vacant and unused – Prior studies recommended costly remediation – Center parcel not eligible for BF funding. – Restrictions prohibit planned redevelopment

Site Investigation Approach • Involved DTSC early in the planning phase • Clearly established project goals and objectives • Strategically located boring locations

• Shared preliminary results throughout project

Results and Recommendations • Target VOCs show trending decrease in concentrations • Concentrations do not present an unacceptable risk to human health • DTSC concurred that No Further Action was warranted • Saved the City of Vista up to $500K in remediation costs.

Thank You!! Noemi Emeric-Ford US EPA – Region 9 213-244-1821 [email protected]

Daryl Hernandez, PE E2 ManageTech, Inc. 858-217-5306 [email protected]