Preventative Electrostatic Clean (Covid-19)

Contents

Introduction ................................................................................................................................................................................................................ 2 Risk Assessment - Evaluating the Risk ..................................................................................................................................................................... 4 Scope of Works ......................................................................................................................................................................................................... 15 Preparation ............................................................................................................................................................................................................... 15 Cleaning process ....................................................................................................................................................................................................... 15 Identification of Other Hazards: .............................................................................................................................................................................. 16 Access and Egress ..................................................................................................................................................................................................... 16 Personal Protective Equipment (PPE) ....................................................................................................................................................................... 17 Emergency Procedures ............................................................................................................................................................................................ 17 Signatures ................................................................................................................................................................................................................. 17

SUK0223 V1 2019

Introduction As required by Section 3 of the Management of Health and Safety at Work Regulations 1999, this risk assessment covers the reasonably foreseeable, significant hazards to be encountered at this location. This risk assessment is in addition to the Health and Safety Management Policy covers all work activities carried out. Sasse Facilities Management has a policy that sets out how they will manage health and safety. In general, the basic control of risks will be implemented by the Operations Managers, Supervisors and Employees who are suitably trained, experienced and have the level of knowledge and competence required to do their work safely. Where inexperienced personnel are engaged, their tasks will be limited to within their capability and they will be closely supervised. Sasse Facilities Management will liaise constantly with the Clients management and health and safety personnel to ensure there are no conflicts with their health and safety arrangements. An appropriately qualified health and safety manager experienced in facilities management, has been engaged to advise on compliance with health and safety legislation and safe working practices. This Risk Assessment The main purpose of this risk assessment is to endeavor to reduce the likelihood of any unnecessary accidents causing injuries to people or damage to equipment as well as to comply with all relevant UK and EU health and safety legislation. The controls advised here are considered suitable and sufficient to control the risks as far as is reasonably practicable. Any significant change in procedures or occurrences will require this assessment to be reviewed. This risk assessment must remain a live document and be continually reviewed and revised as and when necessary to ensure it remains relevant.

SUK0223 V1 2019

Risk assessment Details of the following statements and rules that are to be followed are further detailed in The Employee Handbook. All employees will wear standard issued Sasse Facilities Management Uniforms, PPE and have Security Passes visible Employees will be required to Sign in on arrival at the beginning of shift Employees will make sure they have a site induction within the last year Employees should not use personal mobile devices while working After signing in, employees will gather any equipment required to complete tasks designated to them Employees will be processed and accredited according to guidelines, and passes issued and controlled by Operations Team Employees should NOT go in any unauthorized areas without permission

1. 2. 3. 4. 5. 6. 7.

Unattended/Suspicious Baggage Do not interfere with the item, or allow anyone else to do so Try to ascertain if the owner is in the vicinity If required telephone Security giving your name, provide a description and the exact location of the suspicious baggage Await response from the clients Duty Manager, Sasse Area manager or Site security

   

Emergency Evacuation On discovery of fire - break glass of nearest Fire Point alarm & report by telephone, state location and your identity.    

Attack fire using correct extinguisher, only if safe to do so, do NOT put yourself at risk; Do not stop to collect belongings and do not lock doors & shutters; Report to the nearest Assembly Point coordinator when all staff are accounted for; Wait until ALL CLEAR - (staff to return message), before re-entering the affected areas.

 

If the Fire Alarm has been activated in your area, please leave the area immediately. If the Fire Alarm has been activated in another part of the building, please be ready to evacuate if required.

SUK0223 V1 2019

Risk Assessment - Evaluating the Risk Each significant hazard identified must be evaluated to determine whether it presents a high, medium or low risk to help decide what precautions are required to be put in place to control the risk to an acceptable level. Use the table below to help evaluate the level of risk by considering how likely it would be that the hazard would cause harm and if it did, how serious the consequences might be. Likelihood Severity

2 – Occasional / Possible

3 - Frequent

4 - Regular

5Common

1 – No injury

2 – Minor / First Aid

3 – 7-day absence

4 – Specified injury (Major injury)

5 - Fatal

1- 2 = LOW ( to be continually monitored)

Risk Rating

3 – 5 = MEDIUM (to be continually monitored)

(L x S = R)

Risk Assessment:

1 - Unlikely

6 – 25 = HIGH (Not acceptable)

Electrostatic & ULV Fogging

Reference No.

Rev

Date

TS03

1

10.03.2020

This is a risk assessment into the Electrostatic, ULV Fogging and general deep cleaning tasks completed by the transport division. This assessment will be accompanied by Method Statements, High Risk works assessments and specific works assessments if required. Location:

All Bus depots

SUK0223 V1 2019

Assessed by

Matheu Thompson

Possible Effect & to Whom?

Hazard Description

Manual Handling

Possible effect:

Risk from: The transporting or supporting of a loads including lifting, putting down, pushing, pulling, carrying or moving.    

Carrying Loads Uneven surfaces Steps and Stairs Load, size and stability

SUK0223 V1 2019

   

Musculoskeletal injury Cuts and abrasions Repetitive strain injury Strike injuries

Effect to:  Employees

Initial Risk L

S

R

3

3

9

Control Measures       

Provision of non-slip steel toe cap footwear Provision of protective gloves high visibility vest or jacket is to be worn Staff instructed to complete dynamic RA using the TILE technique. Staff instructed to lift in pairs and not lift any load felt to be excessive. Manual handling training is provided with annual re-fresher training Risk assessments completed for all high risk manual handling activities

Residual Risk L

S

R

1

3

3

Comments /Further Actions 

Cross reference to manual handling risk assessments

Hazard Description

Slips, Trips and Falls Risk from:       

When navigating stairs Loose footing Crowded storage areas Poor housekeeping Wet floors Uneven surfaces Blocked routes

SUK0223 V1 2019

Possible Effect & to Whom? Possible effect:  Potential of specified injury from tripping or slipping Effect to:  Employees  Those in the vicinity

Initial Risk L

S

R

2

4

8

Control Measures

     

Work area to be cordoned off Warning signs are put in place and must be used when conducting cleaning Near miss reporting procedure in place Employees ensure fire routes always kept clear Machinery, tools and equipment to be kept tidy Spillages to be cleaned up promptly

Residual Risk L

S

R

1

4

4

Comments /Further Actions

Hazard Description

Night Working Risk From: 

Falling ill or suffering fatigue while isolated

Possible Effect & to Whom? Possible effect:  Fatigue  Stress  Anxiety  Illness Effect to:  Employees

Initial Risk L

S

2

3

Control Measures

R 6



  



SUK0223 V1 2019

Training and information on the risks of shift work is provided to ensure supervisors and management can recognise problems. Control on overtime, shift swapping and on-call duties is managed. Means of contact for lone workers is provided. Management encourage workers to tell their GPs that they are shift workers and to have regular health check ups Pre-occupational health checks competed

Residual Risk L

S

R

1

3

3

Comments /Further Actions

Hazard Description Spillage Clearing Risk From:    

Chemical irritations Slips, Trips and Falls Repetitive Strain Injury Infection through contact with spillage on broken ski

Sweeping, brushing and Mopping Uneven surfaces Sharps exposure Risk From:  

Slips, trips and falls Manual handling

SUK0223 V1 2019

Possible Effect & to Whom? Possible effect:  Illness from hazardous substance or injury from falling

Initial Risk L

S

R

2

4

8

Effect to:  Employees  Those in the vicinity

Control Measures

  





Possible effect:  Cuts and abrasions  Musculoskeletal injury from repetitive motion  Fractures from falls. Effect to:  Employees  Those in the vicinity

2

3

6

Non- slip footwear to be worn Protective gloves to be worn Cordon of area where required with appropriate signage warning third parties of activity taking place Complete clean-up of spillage as per the instruction identified within the relevant COSHH assessment. Spill kits available

   

Provision of non-slip sturdy footwear Provision of protective gloves Sharps container for disposal of needles Staff receive manual handling training

Residual Risk

Comments /Further Actions

L

S

R

1

4

4



Cross reference to relevant CoSHH assessment spill procedure

1

3

3



Cross reference to Manual handling assessments Cross reference to sharps handling method.



Hazard Description

Fogging Machine: ULV & Electrostatic Electrocution: 

Check Fogging Machine for defects

Possible Effect & to Whom? Possible effect: Electric Shock Fatality from Electrocution Effect to: Employees

Initial Risk L

S

R

2

3

6

Control Measures

  

 

SUK0223 V1 2019

Ensure Wiring is of a good condition with no bare or cut wires Ensure the machine has been inspected for damage and is safe to use Only use a power source that has been approved for use and ensure the cable is fitted with a RCD Ensure your hands are dry before touching the plug socket Only activate the fogger once it has been filled and plugged into the designated power source

Residual Risk L

S

R

1

3

3

Comments /Further Actions

Fogging: 

Exposure To Chemical

Possible effect:  

Injury Illness from Substance exposure



Effect to:

 

Employees Those in the vicinity

3

3

9

1   

  



  

SUK0223 V1 2019

Safe Systems of Work and method provided for Fogging Correct PPE to be worn Substances used are CoSHH assessed and control measures followed by operatives Isolation of ventilation systems for ULV Fogging Restrict access, brief site contact to cascade restrictions to site members Plan your treatment route and exit strategy that you will take whilst walking away from the mist produced by the fogging machine Ensure all personnel and animals are excluded from the treatment area prior to starting Follow label instructions for minimum PPE Selection PPE must be in date and checked Employees must be trained in the inspection/fitting and use

3

3



Cross reference to CoSHH assessment

Possible Effect & to Whom?

Hazard Description

Spillage Clearing Hazardous Risk from:    

Chemical irritations Slips, Trips and Falls Repetitive Strain Injury Infection through contact with spillage

Fogging : Exposure To Chemical when filling fogging units

L

S

R

2

4

8

Possible effect:  Illness from hazardous substance or specified injury from falling

Control Measures

   

Effect to:  Employees  Those in the vicinity



 Possible effect:

2

4

8

 



Illness from hazardous substance

Effect to:  Employees

SUK0223 V1 2019

Initial Risk



Non- slip footwear to be worn Protective gloves to be worn Use Biohazard Disposal Kit where required Cordon of area where required with appropriate signage warning third parties of activity taking place Complete clean-up of spillage as per the instruction identified within the relevant CoSHH assessment. Spill kits available

Wear suitable PPE including gloves Fill the fogger on a suitable surface Only fill with the amount needed to complete the current treatment

Residual Risk L

S

R

1

4

4

1

4

4

Comments /Further Actions

Possible Effect & to Whom?

Hazard Description

Fogging: 

Exposure To Chemical

Possible effect: Risk of illness/Injury through chemical exposure Effect to:

L

S

R

2

3

6

Control Measures





 

SUK0223 V1 2019

Initial Risk

Employees Those in the vicinity





Set Foggers to correct dosage rate as specified within the product label Calculate the area volume to be treated and set the machine dose rate accordingly following the manufactures instructions Only employees trained and competent in the use of a Fogger must undertake any part of this task

Residual Risk L

S

R

1

3

3

Comments /Further Actions

Hazard Description COSHH Using chemicals for professional cleaning tasks Risk of:  

Possible Effect & to Whom? Possible effect:  Illness from hazardous substance Effect to:  

Chemical exposure Fire

Initial Risk L

S

R

2

3

6

Control Measures



 

Employees Those in the vicinity

     

Fogging: Application of Chemical during treatment

Possible effect:  Illness from hazardous substance Effect to:  

SUK0223 V1 2019

Employees Those in the vicinity

2

3

6

  

Specific COSHH assessments are undertaken for all Hazardous/Harmful substances PPE issued to all staff Safe storage of COSHH products and regular checks carried out on PPE Good Housekeeping ensured Safe system of work/method statements Isolation and signage utilised Smoking only permitted in designated areas Spillage control/Spill kits are provided where necessary Training in CoSHH awareness completed Wear suitable PPE including gloves and respirator. Refer to the product label for the minimum PPE requirements Use Equipment as trained

Residual Risk

Comments /Further Actions

L

S

R

1

3

3



Cross reference to CoSHH assessments

1

3

3



Cross reference to CoSHH assessments

Possible Effect & to Whom?

Hazard Description Fogging: Ventilating The Work Area

Possible effect: Illness from hazardous substance Effect to: 

 

SUK0223 V1 2019

Employees Those in the vicinity

Initial Risk L

S

R

2

5

10

Control Measures 

Area must be ventilated to remove chemical from the atmosphere before removing restrictions

Residual Risk L

S

R

1

5

5

Comments /Further Actions

Method

Scope of Works To disinfect all areas of a bus, property or room by wiping of touch points, general overall clean or electrostatic clean. Approach to the work (follow each step) Preparation 

Put on all PPE including the following; o o

 

Safety boots or shoes Gloves

Check all electric equipment is switched off and unplugged Ensure that no persons, animals are on the bus that is to be cleaned

Cleaning process        

Fogging should be completed from the furthers point away working back towards the entrance to the bus Add 90ml of Sychem control product to 7.4 litres of warm water (no hotter than 40 degrees Celsius) Add solution to fogging sprayer Ensure battery on electrostatic fogger is free from damage and fully charged Check that fogging machine switch is in the OFF position Install battery into electrostatic fogger Re-check that the bus is free from animals & persons Work from furthest point of the bus and work towards the door

SUK0223 V1 2019

    

Switch on electrostatic sprayer moving the machine from left to right walking backwards towards the exit door. Repeat these steps for each bus which requires fogging. Do not remove respirator or PPE equipment until in a well ventilated area clear from the work zone Stainless steel and metal surfaces may need to be wiped down with a microfibre cloth following electrostatic spraying to remove water droplet markings. Use ready to use trigger spray solution and a microfibre cloth Mist surface and buff to a sheen as required

General Notes Every effort has and will be made to ensure this work is carried out to an appropriate standard. Control measures are in view of the circumstances intended and are to exceed the minimum guidance notes provided by the WHO. Identification of Other Hazards: Hazardous Substances (COSHH): The following substances are to be used on this project: 

Sychem CONTROL Concentrate

A CoSHH file reviewed by the operative and supervisor, describes the precautions needed for working with the hazardous substances used. No other Hazardous Substances have been identified. Where these become apparent we will amend this method statement. Access and Egress Arrangements are identified prior to work commencement. Work in hot environments does not apply to these works. There are no perceived risks other than the aforementioned arising from the activities undertaken in the Premises.

SUK0223 V1 2019

Personal Protective Equipment (PPE) The following PPE is to be used during this task:   

Safety boots or shoes Gloves Goggles

Emergency Procedures Fire procedures   

Raise the alarm Evacuate the work area. Assemble at muster point

Signatures Site Supervisor (having read and understood the method statement) Signed:………………... Date: .......................... Site Operative: (having read and understood the method statement)

SUK0223 V1 2019

Signed:………………… Date: …………………..

SUK0223 V1 2019