CONSTRUCTION OF TAILING DAMS IN THE MINING INDUSTRY
GIDROKOR KAZAKHSTAN Company since 2006 responsible of installation of the geomembrane and its leader in this segment. GIDROKOR KAZAKHSTAN is a member of International Association of Geosynthetics Installers IAGI and in the International Geosynthetics Society IGS
INDUSTRY LEADER
2006
since
COMPANIES TRUST US.
GIDROKOR KAZAKHSTAN Company successfully realized projects in the market. We work in the territory of Kazakhstan, Russia, Kyrgyzstan, Uzbekistan, etc.
All products and works have the necessary licenses and certificates.
PROBLEMS IN THE INDUSTRY Bad quality liners Low qualification of the installers Working without QA/QC Huge ecological penalties
ENVIRONMENTAL
disaster Г.
WE USE ONLY THE BEST QUALITY GEOMEMBRANES from the best manufacturers
GIDOKOR KAZAKHSTAN is a highly qualified installers of geomembranes and use best quality geomembranes according international standards GRI GM 13. The advantage of geomembranes from these manufacturers is the high quality of their products, which ensures environmental safety.
We USE
ATARFIL, GSE, SOLMAX geomembranes.
OUR ADVANTAGES Complaince with international standards
EPC CONTRACTS
turnkey work EARTHWORK CONSTRUCTIONS
Quality materials frost-resistant and UV-resistant Certified of quality control organizations Quality control is carried out on the equipped field lab Safety control
Г.
EQUIPMENT FOR INSTALLATION
WELD
Welding of geomembrane is carried out only by professional special equipment.
QA/QC of welding seams ACCORDING INTERNATIONAL STANDARTS
VISUAL INSPECTION Search for discrepancies NON-DESTRUCTIVE TESTING OF CONTACT SEAMS Sparkling test Vacuum box Air Test DESTRUCTIVE METHOD Seam tensile strength Sampling for testing the strength of the seam *Maintenance of documentation in two languages
OUR PROJECTS
CARAVAN RESOURCES
Heap leach. 700 000 m2
since
2017 2006
С
OUR PROJECTS
POLYMETAL
Waste tailing dam. 1 600 000 m2
since
2017
OUR PROJECTS
KAZMINERALS AKTOGAY / BOZSHAKOL
Heap leach. 2 000 000 m2
since
2014
OUR PROJECTS
CHINA GOLD KYRGYZSTAN
Waste tailing dam. 200 000 m2
since
2018
OUR PROJECTS
UMZ
Waste tailing dam. 2 000 000 m2
since
2006
OUR PROJECTS
Pavlodarenergo
since
2014
Coalash dam. 1 700 000 m2
THANK YOU! WE COVERED
21.536
mil. m2
www.gidrokor.kz